+31 (0)88 02 43 700
  • GMS | Shamal

    Read more

    After being successfully involved with the completion of Basic Design and the realisation of full Detail Design for systems and outfitting for the S-class jack-up vessels, Gulf Marine Services (GMS) has assigned C-Job Naval Architects to also perform the same scope of engineering for the 2nd series of E-class jack-up vessels, as the overall quality of the S-class project... GMS | Shamal

  • Neptune Shipyards | AHTSV

    Read more

    Anchor Handler Tug Supply Vessel (AHTSV), concept design made for Neptune Shipyards, Werkendam. DP2, 92,50 meter by 19,50 breadth mid. Deck load of 7 ton/m2 and accommodation for 50 persons. Bollard pull up to 120 ton.  Neptune Shipyards | AHTSV

  • Neptune Shipyards | OSV

    Read more

    Concept design of an OSV for Neptune Shipyards, Werkendam.

    Neptune Shipyards | OSV
  • Van Oord | Jan Steen

    Read more

    For Van Oord, C-Job has performed several Modifications and Engineering assignments. One example is the modification of an Anchor Rack on the Jan Steen.

    We also designed the deck foundation for the complete trencher system which consists of a A-frame, trencher and umbilical. Van Oord | Jan Steen

  • Volker Stevin | Nordica

    Read more

    For Volker Stevin, C-Job performed the modification for the aft deck and the chute design for cable laying activities.

    Volker Stevin | Nordica
  • Van Oord | Stingray

    Read more

    Modification of pipe laying vessel “Stingray”. Basic & Detail Design of multiple modifications. Challenge of these projects manifested itself as the barge needed to operate at shallow Draft. Other projects consisted out of making the intact and damage stability booklets. Van Oord | Stingray

working at C-Job We're looking for new engineering talent make an appointment Without any obligation